AI DATA CENTRE CONSTRUCTION

AI DATA CENTRE CONSTRUCTION PIPING

We create custom piping systems with your best interest in mind.

AI data centres and computing facilities are a rapidly expanding industry, and with the push for additional infrastructure, it’s tempting to prioritize production speed for your new piping system. But what you really need for long-term success and minimal downtime, is quality, and an experienced fabricator that knows how to produce quality work. At Douglas Barwick, we create custom piping systems with your best interest in mind, including reliability, leak prevention, longevity, and fast installation for minimal downtime.

Data Centre Cooling Considerations

We manufacture welded pipe, fittings, flanges, fabricated spool assemblies, and modular piping systems for AI data centre construction and mechanical infrastructure. Our systems are designed with quality, reliability, and longevity in mind, preventing the system breakdowns you care about most like leaks and corrosion. The concerns we account for when building piping systems for AI data centres include:

  • Zero-leak tolerance for critical liquid cooling and hydronic systems,
  • A high-efficiency flow design for chilled water and glycol loops,
  • Prefabricated spool assemblies for rapid on-site installation,
  • Long-term corrosion resistance, and
  • Reliable performance even with continuous use.

HVAC and Cooling Pipe Materials

Material selection is critical in data centre cooling systems, where uptime, efficiency, and reliability are essential. For your systems, we prefer the classics.

304L stainless steel is often used for chilled water loops and general cooling water systems, providing excellent corrosion resistance and cost-effective performance in controlled environments. We use 316L stainless steel where glycol systems, higher corrosion risk, or more aggressive water chemistry require enhanced durability and long-term reliability.

If your system has unique considerations or concerns, we can also custom fabricate your piping system in a wide range of specialty alloys. Get in touch with us to discuss how we can build the right piping system for you.

Common Products

We manufacture a wide range of piping products for AI data centre mechanical systems, including:

  • ASTM A312 stainless steel pipe
  • ASTM A358 large-diameter cooling water pipe
  • ASTM A403 butt-weld fittings
  • Large-radius elbows
  • Flanged cooling headers
  • Stainless steel flanges and transition components
  • Modular mechanical room piping systems

Our custom pipe spools are prefabricated and assembled in our shop, and shipped to you for quick, easy installation, limiting your downtime and reducing the risk of on-site assembly errors that could cause system failures.

Frequently Fabricated Sizes

At Douglas Barwick, we manufacture pipe ranging from ¾ inch NPS up to 96 inches in diameter, with fittings and accessories to match. AI data centres like yours often use smaller-diameter distribution piping for in-rack and zone cooling systems, along with larger-diameter piping for central utility plants, chilled water distribution, and heat rejection systems. We manufacture light-wall Schedule 10S and heavy-wall spools (14 gauge to 0.500″ wall thickness), with custom sizing available to accommodate high-pressure central plant headers.

Certifications and Standards

Our data centre piping systems can be manufactured to meet applicable industry standards and project specifications, including:

  • ASTM A312
  • ASTM A358
  • ASTM A403
  • ASME B31.1/ASME B31.3
  • ASME Section IX
  • ANSI/ASME B36.19M

Learn more about the certifications we carry and the standards we uphold by reading about our quality assurance program.